Network Administration lab COMPUTER SCIENCE 3RD SEMESTER SYLLABUS
Network Administration lab COMPUTER SCIENCE 3RD SEMESTER SYLLABUS - Diploma
|
Course Title: Network Administration lab |
||
Scheme (L:T:P) : 0:2:4 |
Total
Contact Hours: 52 |
Course Code: 15CS37P |
|
Type of
Course: Practical’s & Student
Activity |
Credit :03 |
Core/
Elective: Core |
|
CIE- 25 Marks SEE-
50 Marks |
Course
Outcome |
Experiment linked |
CL |
Linked PO |
Teaching Hrs |
|
CO1 |
Identify the different
faults related to CPU and RAM |
1 to 4 |
U, A |
1 to 10 |
18 |
CO2 |
Demonstrate the skills for assembly and disassembly
of a PC and install OS |
5-6 |
A |
1 to 10 |
12 |
CO3 |
Demonstrate the skills for computer networking and
its services. |
7-11 |
A |
1 to 10 |
48 |
|
Total
sessions |
78 |
Course |
Programme Outcomes |
|||||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
|
Network
Administration Lab |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
1 |
Study and prepare a comparative report about the make, model,
configuration, etc., of different types of Printers. |
2 |
Study and prepare a comparative report about the make, model,
configuration, etc., of different types of Scanners. |
3 |
Study and prepare a comparative report about the make, model,
configuration, etc., of different types of computer systems / laptops etc. |
4 |
Study and prepare a comparative report about the make, model,
configuration, etc., of different network components and devices such as router,
switches, etc. |
5 |
Video conferencing using skpye etc. |
Method |
What |
To whom |
When/Where
(Frequency in the course) |
Max Marks |
Evidence
collected |
Course outcomes |
|||
Direct Assessment meth |
CIE |
IA |
Students |
Twice (average two tests) |
test of |
10 |
Blue books |
1,2,3 |
|
Record |
10 |
Record |
|||||||
Student activity |
05 |
Report |
|||||||
Total |
25 |
|
|
||||||
SEE |
End Exam |
End of the course |
50 |
Answer scripts at BTE |
1,2,3 |
||||
Indirect Assessment |
Student Feedback course |
on |
Students |
Middle of the course |
|
Feedback forms |
1,2 Delivery
of course |
||
End Course Survey |
of |
End of course |
the |
|
Questionnaires |
1,2,3 Effectiveness of Delivery
of instructions & Assessment Methods |
Sl. No |
Bloom’s Category |
% |
1 |
Remembrance |
10 |
2 |
Understanding |
20 |
3 |
Application |
70 |
DIMENSION |
Unsatisfactory 1 |
Developing 2 |
Satisfactory 3 |
Good 4 |
Exemplary 5 |
Score |
Collection of data |
Does not collect any information relating to the topic |
Collects very
limited information; some relate to the
topic |
Collects some
basic information; refer to the topic |
Collects
relevant information; concerned to the topic |
Collects a
great deal of information; all refer to the topic |
3 |
Fulfill team’s roles &
duties |
Does not
perform any duties assigned to the
team role |
Performs very little duties |
Performs nearly all duties |
Performs all duties |
Performs all duties of assigned team roles with presentation |
4 |
Shares work equally |
Always relies
on others to do the work |
Rarely does the assigned work; often needs reminding |
Usually does the assigned work; rarely needs reminding |
Does the assigned job without having to be reminded. |
Always does
the assigned work without having to be reminded
and on given time frame |
3 |
Listen to other Team mates |
Is always
talking; never allows anyone else to speak |
Usually does most of the talking; rarely allows others to speak |
Listens, but
sometimes talk too much |
Listens and contributes to the relevant topic |
Listens and contributes precisely to the relevant topic and
exhibit leadership qualities |
3 |
|
|
|
TOTAL |
13/4=3.25=4 |
1 |
Writing Procedure for two experiments (One each from Part A &
Part B) |
10+10=20 |
2 |
Conduction any ONE |
20 |
3 |
Viva-Voce |
10 |
|
Total |
50 |
Sl. No. |
Equipment |
Quantity |
1 |
Servers |
02 |
2 |
PC systems (latest configurations with speakers) |
20 |
3 |
Laser Printers |
02 |
4 |
Scanners |
02 |
5 |
Web cameras |
|
6 |
Crimping Tools |
10 |
7 |
Mulitmeter |
10 |
8 |
I/O box Punching tool |
10 |
9 |
LAN Tester |
10 |
10 |
Wireless Router |
04 |
11 |
CAT 6e cable |
As Required |
12 |
24 Port switches |
04 |
13 |
I/O Boxes for networking |
As required |
14 |
RJ 45 connector |
As required |
15 |
Broad Band Connection |
01 |
16 |
Windows server software |
10 user licence |
Comments