COURSE CONTENT AND EVALUATION CHART FOR SEE CIVIL DIPLOMA 5TH SEMESTER
Sl. No |
Bloom’s
taxonomy |
%
in Weightage |
1 |
Remembering and Understanding |
50 |
2 |
Applying the knowledge acquired from the course |
30 |
3 |
Analysis |
10 |
4 |
Synthesis ( Creating new knowledge) |
10 |
5 |
Evaluation |
0 |
|
What |
To who m |
When/Where (Frequency in the course) |
Max
Marks |
Evidence collected |
Course outcomes |
|
Direct assessment |
CIE |
IA |
Students |
Graded exercises (Average marks of all 16 drawing
sheets) |
20 |
Drawing sheets / Index sheets |
1to 4 |
Student Activities/ Case Study |
05 |
Report + photos |
1 to 4 |
||||
SEE |
end exam |
End of the course |
100 |
Answer scripts at BTE |
1 to 4 |
||
Indirect
assessment |
student feedback on course |
Students |
Middle of the course |
|
Feedback forms |
Delivery of course |
|
End of course survey |
End of the course |
|
Questionnaires |
Effectiveness
of delivery of instructions & assessment methods |
UNIT NO |
NAME OF THE UNIT |
SHEETS |
TITLE
OF THE DRAWING |
MINIMUM NO OF EXERCISE |
1 |
Earthen bunds and canals |
2 |
Earthen bunds |
3 |
1 |
Canals |
3 |
||
2 |
Tank Sluice |
4 |
Tank Sluice with Head and Gibbet wall type and plug arrangement |
1 |
Tank sluice with Tower head type and shutter arrangement |
1 |
|||
Pipe sluice
with Tower head and plug arrangement |
1 |
|||
Pipe sluice
with head and gibbet wall type and plug arrangement |
1 |
|||
3 |
Tanks/waste
weirs |
2 |
Waste weir with water cushion |
1 |
Surplus weir with Stepped apron |
1 |
|||
4 |
Culverts |
4 |
Single span slab culvert with splayed wing walls |
1 |
Two span slab culvert with
return wing walls |
1 |
|||
Two span box culvert with splayed wing walls |
1 |
|||
Pipe
culvert with return wing walls or splayed wing wall |
1 |
|||
5 |
R.C.C. T - Beam Bridge (Railways & Highways) |
3 |
(i)Two span R.C.C. T -
Beam highway Bridge with return wing wall |
1 |
(ii) Two span RCC T-beam Highway bridge with splayed wing walls. |
1 |
|||
(iii)A two span RCC T-Beam
Railway bridge with splayed wing walls. |
1 |
|||
|
TOTAL |
16 |
|
19 |
Unit No |
Topic of the Unit |
Sheet no |
Date |
Title of the Sheet |
Max Marks |
Marks Obtained |
Average IA Marks Unit wise |
1 |
Earthen bunds and canals |
1 |
|
(i)Earthen bunds |
20 |
|
|
2 |
|
(ii)Earthen bunds |
20 |
|
|||
3 |
|
Canals |
20 |
|
|||
2 |
Tank Sluice |
4 |
|
Tank Sluice with Head
and Gibbet wall type and plug arrangement |
20 |
|
|
5 |
|
Tank Sluice with Tower
head type and shutter arrangement |
20 |
|
|||
6 |
|
Pipe sluice with
Tower head and plug arrangement |
20 |
|
|||
7 |
|
Pipe sluice with
Head and Gibbet wall type and plug
arrangement |
20 |
|
|||
3 |
Tanks/waste weirs |
8 |
|
Waste weir with water cushion |
20 |
|
|
9 |
|
Surplus weir with Stepped apron |
20 |
|
|||
4 |
Culverts |
10 |
|
Single span slab culvert with splayed wing walls |
20 |
|
|
11 |
|
Two span slab
culvert with return wing walls |
20 |
|
|||
12 |
|
Two span box culvert with splayed wing walls |
20 |
|
|||
13 |
|
Pipe culvert with return wing walls or splayed wing wall |
20 |
|
|||
5 |
R.C.C. T - Beam Bridge (Railways &
Highways) |
14 |
|
(i)Two span R.C.C. T - Beam highway Bridge with return wing wall |
20 |
|
|
15 |
|
Two span RCC T-beam Highway bridge with splayed wing walls. |
20 |
|
|||
16 |
|
(iii)A two span RCC T-Beam Railway bridge with splayed wing walls. |
20 |
|
Unit |
I |
II |
III |
IV |
V |
Average IA Unit Wise (U1+U2+U3+U4+U5) 5 |
CO |
CO1 |
CO2 |
CO3 |
CO4 |
CO5 |
|
Marks |
|
|
|
|
|
|
Comments