ESTIMATION AND COSTING CIVIL DIPLOMA 5TH SEMESTER Syllabus
|
|||
Credits (L:T:P) : 4:0:0 |
Total
Contact Hours: 52 |
Course Code:
15CE53T |
|
Type of Course: Lectures,
Practices, Student activity |
Credit :04 |
Core/
Elective: Core |
|
CIE- 25 Marks SEE-
100 Marks |
Course Outcome |
CL |
Linked PO |
Teaching Hrs |
|
CO1 |
Compare
different types of estimate, units of measurements & payments for
different item of works in construction and illustrate a relationship to Bill
of Quantities and Scheduled rates. |
R/U/Ap |
1,2,5, 7,10 |
04 |
CO2 |
Explain the specifications
of different Items of works. |
R/U |
1,2,3,5,6,7,10 |
05 |
CO3 |
Analyse the rates of different Items of
works. |
Ap/Ay |
1,2,5,6,7 |
08 |
CO4 |
Estimate
the quantities and evaluate the abstract
cost for different types of buildings
by Long wall-short wall method |
Ay/Ap/E |
1,2,3,5,6,7,10 |
13 |
CO5 |
Estimate
the quantities and evaluate the abstract
cost for different types of buildings
by Centre line method |
Ay/Ap/E |
1,2,3,5,6,7,10 |
13 |
CO6 |
Estimate the quantities of
earth works and evaluate the abstract cost for road works |
Ay/Ap/E |
1,2,3,5,6,7,10 |
09 |
CO7 |
Organize
Quantity surveying for any kind of civil structures using modern tools and
manage the project problems, formulate and
solve in teams, in order to improve future problem solving ability and
able to present it. |
R/U/Ap/ Ay/C |
1 to 10 |
- |
TOTAL |
52 |
UNIT |
MAJOR TOPICS |
HOURS
ALLOTTED |
PART-A |
||
1 |
INTRODUCTION TO ESTIMATION |
04 |
2 |
SPECIFICATIONS |
05 |
3 |
ANALYSIS OF RATES |
08 |
PART-B |
||
4 |
DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS |
27 |
5 |
ESTIMATION OF ROAD WORKS |
08 |
|
TOTAL |
52 |
* Related to Student activity
beyond classroom hours.
Programme outcome Attainment
Matrix
Course |
Programme
Outcome |
|||||||||
PO1 |
PO2 |
PO3 |
PO4 |
PO5 |
PO6 |
PO7 |
PO8 |
PO9 |
PO10 |
|
Basic knowledge |
Discipline knowledge |
Experiments and practice |
Engineering Tools |
Engineer and society |
Environment & Sustainability |
Ethics |
Individual and Team work |
Communication |
Life long learning |
|
ESTIMATION
AND COSTING |
3 |
3 |
3 |
1 |
3 |
3 |
3 |
1 |
1 |
3 |
UNIT |
COURSE CONTENTS |
HOURS |
1.0 |
INTRODUCTION TO ESTIMATION 1. Introduction to
estimating: different items of works and types of estimates. 2. Units of measurements and
units of payment of different items of work. 3. Deduction of Openings in different items of works and Measurements as per BIS-2000. 4. Bill of Quantities (BOQ),
Scheduled rates, Lead Statements. |
04 |
2.0 |
SPECIFICATIONS Earthwork in excavation for foundation, Cement
concrete in foundation, Brick masonry, R.C.C Work, Plastering in Cement
mortar, Pointing with cement mortar, Cement concrete flooring, Granite /
Vitrified / Marble flooring, Centering and shuttering works, Distempering,
Exterior painting (Cement), Woodwork for windows and doors, Painting woodwork
and steel, Glazing works for building. Application of specifications in BOQ. |
05 |
3.0 |
ANALYSIS OF RATES Analysis of rates for the following items of
works. Earthwork
excavation and filling, Cement concrete bed in foundation, Brick masonry in
C.M for superstructure, Hollow concrete /
solid concrete blocks masonry in CM, Plastering with cement mortar,
Pointing with cement mortar, Painting the old and new wood work & Steel
work, CC Flooring, Granite / Vitrified // Marble flooring, Panelled and
glazed doors and windows, R.C.C roofing slab, Distempering, Corrugated
galvanized iron sheet roofing. |
08 |
4.0 |
DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS USING LONG WALL SHORT WALL METHOD Prepare the detailed and abstract estimate of, 1. One room building- Ground
floor with flat RCC roof 2. Two room building- Ground
floor with flat RCC roof 3. 1BHK Residential building
- Ground floor with flat RCC roof and Pitched roof with load bearing wall. 4. 2BHK Residential building
- Ground floor with flat RCC roof for framed
structures. 5. Building with semi
circular/ Hexagonal room walls – Ground floor with flat RCC roof. 6.
School building – Ground floor with flat RCC roof. |
13 |
5.0 |
DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS USING CENTRE LINE METHOD Prepare the detailed and abstract estimate of, 1. One room building- Ground
floor with flat RCC roof 2. Two room building- Ground
floor with flat RCC roof 3. 1BHK Residential building
- Ground floor with flat RCC roof and Pitched roof with load bearing wall. 4. 2BHK Residential building
- Ground floor with flat RCC roof for framed
structures. 5. Building with semi
circular/ Hexagonal room walls – Ground floor with flat RCC roof. |
13 |
|
School building – Ground floor with
flat RCC roof. |
|
6.0 |
ESTIMATION OF ROAD WORKS Detailed Estimates and Abstract of Cost of Road work. 1. Compute earth work
quantities from given cross sectional details. 2. Preparation of Detailed
Estimates and Abstract of Cost of Bituminous & concrete Roads |
08 |
Dimension |
Students score |
||||
(Group
of five students) |
|||||
STUDENT 1 |
STUDENT 2 |
STUDENT 3 |
STUDENT 4 |
STUDENT 5 |
|
Rubric Scale |
Unsatisfactory 1, Developing 2, Satisfactory 3, Good
4, Exemplary5 |
||||
1.Organisation |
2 |
|
|
|
|
2.Team’s roles & duties |
3 |
|
|
|
|
3.Conclusion |
4 |
|
|
|
|
4.Convensions |
5 |
|
|
|
|
Total |
14 |
|
|
|
|
Average=(Total /4) |
3.5=4 |
|
|
|
|
Note: Concerned faculty (Course
coordinator) must devise appropriate rubrics/criteria for assessing Student
activity for 5 marks One activity on any one CO (course outcome) may be given
to a group of FIVE students |
Dimension |
Rubric
Scale |
||||
1 Unsatisfactory |
2 Developing |
3 Satisfactory |
4 Good |
5 Exemplary |
|
1.Literature |
Has not included relevant
info |
Has included few relevant
info |
Has included some relevant
info |
Has included many relevant
info |
Has included all relevant
info needed |
2. Fulfill team’s roles & duties |
Does not perform any
duties assigned |
Performs very little
duties |
Performs partial duties |
Performs nearly all duties |
Performs all duties of
assigned team roles |
3.Communication |
Poor |
Less Effective |
Partially effective |
Effective |
Most Effective |
4.Convensions |
Frequent Error |
More Error |
Some Error |
Occasional Error |
No Error |
Course Assessment and Evaluation
Scheme:
|
What |
To whom |
When/Where
(Frequency in the course) |
Max
Marks |
Evidence collected |
Course
outcomes |
||
Direct
Assessment meth |
CIE |
IA |
Students |
Thrice test (Average of
three tests) |
Test 1 |
20 |
Blue books |
CO1, CO2 |
Test 2 |
CO3, CO4 |
|||||||
Test 3 |
CO5, CO6 |
|||||||
Activities |
05 |
Written Report |
CO1,CO2,CO3, CO4,CO5,CO6, CO7 |
|||||
SEE |
End Exam |
End of the course |
100 |
Answer scripts at BTE |
CO1,CO2,CO3,
CO4,CO5,CO6 |
|||
Indirect
Assessment |
Student
Feedback on course |
Students |
Middle of the course |
|
Feedback forms |
CO1 ,CO2,CO3,CO4 Delivery of course |
||
End of Course Survey |
End of the course |
|
Questionna ires |
CO1,CO2,CO3, CO4,CO5,CO6,C O7 Effectiveness of Delivery of instructions &
Assessment Methods |
Unit |
Major
Topics |
Hours A |
Questions
to be set for SEE |
Marks |
weightage (%) |
A* |
B* |
C* |
|||||
Cognitive Levels |
|||||||||||||
R |
U |
Ap |
Ay |
C |
E |
||||||||
1 |
INTRODUCTION TO ESTIMATION |
4 |
60% |
40% |
0% |
0% |
0% |
0% |
20 |
13.3 |
2 |
0 |
0 |
12 |
8 |
0 |
0 |
0 |
0 |
||||||||
2 |
SPECIFICATIONS |
5 |
33% |
53% |
13% |
0% |
0% |
0% |
20 |
13.3 |
2 |
0 |
0 |
8 |
10 |
2 |
0 |
0 |
0 |
||||||||
3 |
ANALYSIS OF RATES |
08 |
13% |
20% |
67% |
0% |
0% |
0% |
20 |
13.3 |
2 |
0 |
0 |
4 |
6 |
10 |
0 |
0 |
0 |
||||||||
4 &5 |
DETAILED AND ABSTRACT
ESTIMATE OF BUILDINGS |
27 |
10% |
10% |
80% |
0% |
0% |
0% |
50 |
33.3 |
0 |
1 |
0 |
5 |
5 |
40 |
0 |
0 |
0 |
||||||||
6 |
ESTIMATION OF ROAD WORKS |
08 |
8% |
32% |
60% |
0% |
0% |
0% |
40 |
26.6 |
0 |
0 |
2 |
4 |
12 |
24 |
0 |
0 |
0 |
||||||||
Total |
52 |
21% |
26% |
37% |
0% |
0% |
0% |
150 |
100 |
6 |
1 |
2 |
|
33 |
41 |
76 |
0 |
0 |
0 |
Sl. No |
Bloom’s
taxonomy |
%
in Weightage |
1 |
Remembering and Understanding |
47% |
2 |
Applying the knowledge acquired from the course |
37% |
3 |
Analysis |
0% |
4 |
Synthesis ( Creating new knowledge) |
0% |
5 |
Evaluation |
0% |
Comments