mechanical engineering | PROJECT WORK-I(Mechanical Stream) | DIPLOMA 5th and 6th Semester
PROJECT WORK-I(Mechanical Stream)
|
Course Title:
PROJECT WORK-I(Mechanical Stream) |
||
Scheme (L:T:P) : 0:1:2 |
Total
Contact Hours: 39 |
Course Code: 15ME58P |
|
Type of Course: Practice |
Credit :- |
Core/ Elective: Practice |
|
CIE- 25 Marks |
Prerequisites: Application learned concepts form the previous
semester studied courses.
Course Objectives:
1.
Learn the objective
of this project is to provide opportunity for the students to implement their
skills acquired in the previous semesters to practical problems/problems faced
by industry/development of new facilities
2.
Make the students come up with innovative/ new ideas in his area of interest.
3.
Identify, analyze and develop opportunities as well as
to solve broadly defined mechanical Engineering problems
4.
Enhance students’ appreciation of the values of social
responsibility, legal and ethical principles, through the analysis and
discussion of relevant articles and real time
projects
Course outcome
On successful completion of the course, the students
will be able to:
Course
Outcome |
CL |
Linked PO |
Allotted
hours |
|
CO1 |
Get an idea and confidence in designing, analysing and executing the project. |
Analysis/creation |
1,2,3,4,8,9,10 |
3hrs/Week |
CO2 |
Apply the knowledge of latest trends in fabrication/ manufacturing and
Relate their ideas while executing the project |
Analysis/creation |
1,2,3,4,8,9,10 |
|
CO3 |
Have
complete understanding of Executing the project |
Analysis/creation |
1,2,3,4,8,9,10 |
|
CO4 |
Prepare documents in team and enhance his written
and oral communication presentations. |
Analysis/creation |
1,2,3,4,8,9,10 |
|
CO5 |
Develop individual
confidence to handle various engineering assignments and expose themselves to acquire life skills
to meet societal challenges |
Analysis/creation |
1,2,3,4,5,8,9,10 |
|
|
|
TOTAL |
|
39 Hours |
MAPPING COURSE OUTCOMES WITH PROGRAM OUTCOMES
Course |
Programme Outcome |
|||||||||
PO1 |
PO2 |
PO3 |
PO4 |
PO5 |
PO6 |
PO7 |
PO8 |
PO9 |
PO10 |
|
|
|
|
|
|
|
|
|
|
|
|
PROJECT WORK |
1 |
3 |
3 |
2 |
1 |
0 |
0 |
3 |
2 |
3 |
Level
3- Highly Addressed, Level 2-Moderately Addressed, Level 1-Low Addressed. Method
is to relate
the level of
PO with the
number of hours
devoted to the
COs which address the given PO. If >40% of classroom sessions addressing a particular PO, it is
considered that PO
is addressed at
Level 3 If
25 to 40%
of classroom sessions addressing a particular PO, it is
considered that PO
is addressed at
Level 2 If 5 to 25%
of classroom sessions addressing a particular PO, it is considered that
PO is addressed at Level 1 If < 5% of
classroom sessions addressing a particular PO, it is considered that PO is
considered not-addressed. |
![]() |
A. INTRODUCTION
The objective of the project work is to enable the students in convenient
groups of minimum of 5 members on a project involving theoretical and
experimental studies related to the
branch of study. Every project work shall have a guide who is the member
of the faculty of the institution. Six periods per week shall be allotted in
the time table and this time shall be utilized by the students to receive the directions from the guide, on
library reading, laboratory work, computer analysis or field work as assigned
by the guide and also to present in periodical seminars on the progress made in
the project.
B.
ROAD MAP FOR THE PROJECT
1. Carry out a session or a
seminar from the ISTE Student Chapter coordinator / Programme coordinator with
the help of Innovation club / I I I cell for directing the students to identify
project areas in the field of their interested including interdisciplinary areas.
2. Power point presentation in
seminar should include detail description of project areas related to program,
Project report formats, developing personnel writing skills.
3. The Students/Departments may
at liberty to form the batch not less than 5 and maximum 8 and get registered
with project coordinator/HOD at the end of V semester.
4. Students should take the
approval from the Project committee/ Head of department for doing project.
5. After approval the batch of
students will be published in department notice board along with guide in the
end of 5th semester.
6. All students should finalize
their Project immediately before commencement of SEE of 5th semester.
7. The types of project may
include:
å
Industrial case study
å
Preparation of a feasibility report
å
Design and development of equipment.
å
The overhauling of existing equipment
å
Creation of New facilities
8. The project should be
challenging but manageable within the resources and time available.
9. Students should undergo
reviews for one times in5th and one times in 6th semester
during the internal assessment. Time table for IA should include project
review. The guide should monitor the progress of Project work periodically and
it should be finally evaluated for 25 marks at the end of 5th
semester and for 25 marks at the end of 6th semester.
10. The IA marks will be
evaluated based on oral presentation and assessment by the internal guide by
adopting Rubrics being developed by Project
committee.
11. Real time problems, Industry
related problems, should be chosen and it is a Responsibilities of the project committee / Programme coordinator/ Innovation club /
I.I.T. cell
to choose the appropriate project and to accept the Project Proposal
12. Identification of Topic: The selection of topic is of crucial importance. It
should be field of interest. It is advisable to choose the project can be
completed on time and within the budget and resources. The topic should be
clear, directional, focussed and feasible.
13.
An outline of project proposal submitted & synopsis
from student will initiate a dialogue between Student and Project coordinator
who will then help you to work on the
chosen topic and report.
C. Industrial visit
Students are required to undergo an industrial visit for period of at
least 3(Three) working days, in V semester only. After completion of their visit
the reports should be prepared. Each Student should write the report
independently in view of his own observation in industry. All days for the
visit should be accounted for clearly giving attendance particulars. The
concern accompanying staff is to check student presence and access progress
periodically
D. l report
Students are required to submit a comprehensive report on factory visit
with details of the organization where the training was undergone. The
comprehensive report should focus on study of plant/ product /process/ along
with intensive in-depth study on anyone of the topics such as processes,
methods, tooling, plant layout and equipment, highlighting aspects of quality,
productivity of the system. Any data, drawings etc should be incorporated with
the consent of the Organization. The comprehensive report should be submitted
for the end exam for evaluation
E.
Thrust areas identified for Project
work Each student may be assigned any one of the following
types of project/thesis work: According
to the local needs, the following major projects are suggested:
1.
Non-conventional energy
-
Low Cost Solar Water Heating System for Domestic Purpose
- Fabrication of Solar cooker
- Study of Community Biogas Plant
-
Fabricate a thermally efficient wood burning stove
- Solar lamps
- Solar powered refrigerator
2.
Mechatronics/Material handling area
-
Motorized object lifting jack
- Key controlled- fork lifter
- Object counting machine
- Stepper motor control with
selected steps for conveyor belts
- Robotic arm with gripper
- Material handling device in
X,Y,Z motion control
- Robotic crane
- Robotic trolley for material
handling
3. Fluid power and control area
Pneumatic/Hydraulic jack Pneumatic/hydraulic crane Air compressed spray gun
Pneumatic transport system
4. Automobile related area
Regenerative braking system
Steering controlled headlight
Engine/motor vibration checker
Seat belt automatic locking system Hydraulic braking
Electromagnetic shock absorber
Digital auto speed limiter
5. Motorized wheel chair
6. Design and Fabrication of
various types of lab equipment’s useful to polytechnic
7. Repair and overhauling of
various machine tools and lab equipment’s available at polytechnic
8. Critical Study of existing
quality systems and inventory control at industry
9. Mechanical industry
fabrication related projects
10.
Automatic mopping machine to clean the floor area
11.
Automatic milling machine with digital
control
12.
PCB fabrication
13.
Any study project related to Mechanical and allied areas in industry
14.
Any project related to industry based problems 15 .Any projects related
to low cost automation
F. Course
Assessment and Evaluation Scheme for Project
work
|
What |
To whom |
When/Where (Frequency in course) |
the |
Max Marks |
Evidence collected |
Course outcomes |
|||
|
|
|
|
At the
5 semester) |
end |
of |
25 |
1. Project Synopsis. 2.
Plan & Schedule 3.
Industrial visit report |
CO1, CO2, CO3,CO4,CO5 |
|
At the 6 semester) |
end |
of |
25 |
1. Project Report. 2.
Presentation hand
outs |
CO1, CO2, CO3,CO4,CO5 |
|||||
End of the course |
Project report project model/Study report |
|||||||||
SEE |
End Exam |
|||||||||
|
Student Feedback on course |
|
Middle of the course |
Feedback forms |
CO1Delivery
of course |
|||||
End of Course Survey |
End of the course |
Questionnaires |
CO1 to CO5 Effectiveness
of Delivery of instructions & Assessment Methods |
*CIE – Continuous Internal Evaluation *SEE
– Semester End Examination
G. Project report
The Project
Report should consist of following items.
1.
Introduction
2. Review of Literature
3. Study Area
4. Methodology/Design/fabrication/Tests
5. Result and Discussion
6. Conclusion and scope for
future study
7. References.
1. Project
reports should be typed neatly in Times New Roman letters with font size 14 for
titles and 12 for text on both sides of the paper with 1.5 line spacing on a A4
size paper (210 x 297 mm). The margins
should be: Left - 1.5", Right -
1", Top and Bottom - 0.75".
2. The total number of reports
(Soft bound) to be prepared are
ß One copy to the department /library
ß One copy to the concerned guide(s)
ß One copy to the candidate.
3. Before
taking the final printout, the approval of the concerned guide(s) is mandatory
and suggested corrections, if any, must be incorporated.
4. Every copy of the report
must contain
ÿ Inner title page (White)
ÿ Outer title page with a
plastic cover
ÿ Candidate declaration and Certificate in the format
enclosed both from the institution and the organization where the project is
carried out.
ÿ An abstract (synopsis) not
exceeding 100 words, indicating salient features of the work.
5. The organization of the report
should be as follows
1. Inner title page |
|
2. Abstract
or Synopsis |
|
3. Acknowledgments 4. Table of Contents |
Usually numbered in
roman |
5. List of table & figures (optional) |
|
Chapters(to be numbered in Arabic) containing
Introduction-, which usually specifies the scope of work and its importance and
relation to previous work and the present developments, Main body of the report
divided appropriately into chapters, sections and subsections.
The chapters,
sections and subsections may be numbered in the decimal form for
e.g. Chapter
2, sections as 2.1, 2.2 etc., and subsections as 2.2.3, 2.5.1 etc.
The chapter must be
left or right justified (font size 16).
Followed by the title of chapter
centered (font size 18), section/subsection numbers along with their
headings must be left justified with section
number and its heading in font size 16 and subsection and its heading in font size 14. The body or the text of the report should
have font size 12.
The figures
and tables must be numbered chapter wise
The last chapter should contain the summary of the
work carried, contributions if any, their utility along with the scope for
further work.
Reference or
Bibliography: The references should be numbered
serially in the order of their occurrence in the text and their numbers
should be indicated within square brackets for e.g. [3]. The section on
references should list them in serial order in the following format.
1.
For textbooks – Dr.Paramar S, Welding process and
technology, Khanna publishers, New Delhi, 2 Edition, 2003.
2.
For papers – Y.Javadi and I.sattari, Welding
distortion in pipes, Journal of pressure vessels and piping, Vol 85, Aug 2008,
pp 337-343
Only SI units
are to be used in the report. Important equations must be numbered in decimal
form for e.g.
ß V = IZ .......... (3.2)
All equation numbers should be
right justified.
Separator sheets, used if any,
between chapters, should be of thin paper
H.C IE ASSESSMENT
FOR FIRST REVIEW( V Semester)
1.
Project identification 05
mark
2.
Project synopsis 10
mark
3. Industrial visit & Report 10mark
![]() |
MODEL OF RUBRICS FOR ASSESSING REVIEWS OF PROJECT
FOR CIE
Student name |
Reg no |
Dimension |
Scale |
Students Score |
||||||||
|
|
|
Unsatisfactory |
Developing |
satisfactor y |
Good |
Exemplary |
1 |
2 |
3 |
4 |
5 |
|
|
Collects |
Collect
much informati
on; but very limited relate to the topic |
Collects |
Collects a |
|
|
|
|
|
||
|
Does not |
very |
some |
great deal |
||||||||
Collection of data |
collect any information relating to |
limited informatio n; some |
basic informati on; most |
of informati on; all |
||||||||
|
the topic |
relate to |
refer to |
refer to |
||||||||
|
|
the topic |
the topic |
the topic |
||||||||
|
Does not |
Performs very little duties but unreliable. |
|
|
Performs |
|
|
|
|
|
||
Fulfil |
perform any |
Performs |
Performs |
all duties |
||||||||
team’s
roles |
duties |
very little |
nearly all |
of |
||||||||
&
duties |
assigned to |
duties |
duties |
assigned |
||||||||
|
the team role |
|
|
team roles |
||||||||
Shares work equally |
Always relies on others to do the work |
Rarely does the assigned work; often needs reminding |
Usually does the assigned work; rarely needs reminding |
Normally
does the assigned work |
Always does the assigned work without having to be reminded. |
|
|
|
|
|
||
Listen to other
Team mates |
Is always talking; never
allows anyone else to speak |
Usually does most of
the talking;
rarely allows others to speak |
Talks good; but never show interest in listening others |
Listens, but sometime
s talk too much |
Listens and speaks a fair amount |
|
|
|
|
|
||
|
Grand Average/Total |
|
|
|
|
|
|
APPENDIX 1
(Cover page)
(A typical
Specimen of Cover Page )<Font Style Times New Roman – Bold>
TITLE OF PROJECT REPORT
<Font
Size 18><1.5 line spacing>
A PROJECT REPORT
<Font
Size 14>
Submitted by
<Font
Size 14><Italic>
NAME OF THE CANDIDATE(S)
<Font Size 16>
in partial
fulfilment for the award of the diploma of
<Font Size 14><1.5 line spacing><Italic>
DIPLOMA IN MECHANICAL ENGINEERING PROGRAMME
<Font Size 16>
IN
DEPARTMENT
OF MECHANICAL ENGINEERING
<Font Size 14> LOGO
NAME OF THE COLLEGE
<Font Size 14>
DEPARTMENT OF TECHNICAL
EDUCATION BENGALURU-560001
<Font
Size 16><1.5 line spacing>
Year
of submission: ( MONTH
& YEAR)
<Font Size 14>
APPENDIX 2
(Title page)
(A typical Specimen of Title Page) <Font Style
Times New Roman – Bold>
A
Project Report on
<TITLE OF THE PROJECT WORK>
Submitted
for partial fulfilment of the requirements for the award of the of
DIPLOMA IN CIVIL ENGINEERING
BY
BATCH
<Mr. / Ms. Name of the Student (Roll No.)>
<Mr. / Ms. Name of the Student (Roll No.)>
<Mr. / Ms. Name of the Student (Roll No.)>
<Mr. / Ms. Name of the Student (Roll No.)>
<Mr. / Ms. Name of the Student (Roll No.)>
Under
the guidance of
<Name of the Staff>
Lecturer Department of ME GPT, Place--------
Department of Mechanical Engineering
<<NAME OF INSTITUTE>>
<<ADDRESS OF INSTITUTE>>
APPENDIX 3 (Certificate)
(A typical
specimen of Bonafide Certificate)
<Font Style Times New
Roman>
DEPARTMENT
OF TECHNICAL EDUCATION BENGALURU-560001
<Font Style Times New Roman – size -18>
BONAFIDE CERTIFICATE
<Font Style Times New Roman – size
-16>
<Font Style Times New Roman
– size -14>
Certified that this project report “……….TITLE OF THE PROJECT……………..”is the bonafide
work of “ NAME OF THE
CANDIDATE(S).…………”who carried out the project
work under my supervision.
<<Signature
of the Head of the Department>> <<Signature
of the Project cordinator>>
SIGNATURE SIGNATURE
<<Name>> <<Name>>
HEAD OF THE DEPARTMENT PROJECT CORDINATOR
<<Academic
Designation>>
<<Department>> Department
of Mechanical Engineering
<<Full
address of the Dept & College >> <<Full
address of the Dept & College
>>
Examiners
1......................<<Signature, Name, Designation& Address>>........
Examiners
2......................<<Signature, Name, Designation& Address>>........
CANDIDATE’S DECLARATION
I, ------------------------------------------ a student of
Diploma in -
Department bearing Reg No of -
hereby declare that I own full responsibility for the information, results and
conclusions provided in this project
work titled “ “submitted
to State Board
of Technical Examinations, Government of Karnataka for the award of Diploma
in .
To the best of my knowledge, this project work has not been submitted in
part or full elsewhere in any other institution/organization for the award of
any certificate/diploma/degree. I have completely taken care in acknowledging
the contribution of others in this academic work. I further declare that in
case of any violation of intellectual property rights and particulars declared,
found at any stage, I, as the candidate will be solely responsible for the same.
Date:
Place: Signature
of candidate
Name: -----------------
---
--
Reg No-----------------
DEPARTMENT OF TECHNICAL EDUCATION
NAME OF THE INSTITUTION
Address
with pin code
Department of ……………………………………………………..
CERTIFICATE
Certified that this project
report entitled ----------------------------------------------------------------
----
----------------------------------------------------------------------------------------”which is being
submitted
by Mr./Ms. ………………………….……………….., Reg. No…..……………, a bonafide student of
…………………………………….in partial fulfilment for the award of Diploma in -----------------Engineering during the year ……………………...
is record of students own work carried out under my/our guidance. It is
certified that all corrections/suggestions indicated for internal Assessment
have been incorporated in the Report and one copy of it being deposited in the
polytechnic library.
The
project report has been approved as it satisfies the academic requirements in
respect of Project work prescribed for the said diploma.
It is further understood that by this certificate the
undersigned do not endorse or approve any statement made, opinion expressed or
conclusion drawn there in but approve the project only for the purpose for
which it is submitted.
Guide(s)
Name and signature
Examiner 1
2 Head
of Department
Dept. of
Format
of Synopsis
1.
Title of the Project
2.
Objectives of the study
3. Rationale for the study
4. Statement of the Problem
5. Detailed Methodology to be
used for carrying out the study
6. The expected contribution
from the study (to perform any laboratory experiments)
7.
List of activities to be carried out to complete the
project (with the help of a bar chart showing the time schedule)
8.
Places/labs/equipment and tools required and planning of arrangements
9. Problems envisaged in
carrying out the project, if any.
10. Brief description of project
in 100 words
Z
![]() |
13
|
|
TASK |
Responsibility |
END OF V SEMESTER |
VI SEMESTER |
|||||||||||||||||
|
WEAKS |
|
11 |
12 |
13 |
14 |
15 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
1 |
Industrial visit |
Students/Faculty |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Seminar regarding Project work |
Project Com/HOD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Batch
formation &Guide allocation |
HOD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Identification of project |
Students/Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Project synopsis Submission |
Students |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Finalisation of Project |
Students/Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Literature survey |
Students/Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Identification of facility to do PW |
Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Study/Fabrication/design of model |
Students/Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Results
discussion/performance testing |
Students |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
Review of Project work by guide |
Students |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Project report submission |
Students/Guide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Comments