CHEMICAL EQUIPMENT DRAWING 6TH SEMESTER DIPLOMA IN CHEMICAL ENGINEERING
BOARD OF TECHNICAL EDUCATION
DIPLOMA IN CHEMICAL ENGINEERING
CLASS : VI SEMESTER
SUBJECT : CHEMICAL EQUIPMENT DRAWING
SUBJECT CODE : 9CH64D
No of Hrs/week: 06 Hrs
Total No. of. Hrs: 96 Hrs
SL.NO | TOPIC | HRS ALLOTED |
1. 2. 3. | Assembly drawing Line sketches of Chemical Engineering Equipments Test and revision | 72 18 06 |
| TOTAL | 96 |
SYLLABUS
SUBJECT: CHEMICAL EQUIPMENT DRAWING
I .Assembly drawing of followings
1 Non-return valve
2 Globe valve
3 Gate valve
4 Ball valve
5 Diaphragm valve
6 Gland cock
7 Rams bottom safety valve
8 Lever safety valve
9 Angle stop valve
10 Bucket trap
11 Invested bucket trap
12 Thermodynamics steam trap
13 Centrifugal pump
14 Ram pump
15 Nylon roller pump
16 Gear pump.
II. Line sketches of following chemical engineering equipments
1 Jacketed vessel
2 Double pipe heat exchanger
3 Shell and tube heat exchanger
4 Reaction vessel
5 Standard vertical tube evaporator
6 Steam jet ejector
7 Rotary drum filter
8 Swenson walker crystallizer
9 Rotary Drum Drier
10 Ball Mill
11 Thickener
12 Venturi meter
TEXT AND REFERENCE BOOK :
1 Machine drawing by N.D. Bhatt
2 Process equipment design by V. Joshi
3 Chemical Engineering data hand book by Perry.
BOARD OF TECHNICAL EDUCATION
DIPLOMA IN CHEMICAL ENGINEERING
CLASS : V SEMESTER
SUBJECT : CHEMICAL EQUIPMENT DRAWING
SUBJECT CODE : 9CH64D
QUESTION PAPER MARKS WEIGHTAGE TABLE
Note : 1. Answer all the questions
2. Finish the drawing in pencil only.
3. Assume missing dimensions.
Sl. No. | Chapter Name | Marks to be allotted | Total Marks |
1 | Free Hand sketches | 20 | 20 |
2 | Assembly Drawing | 70 | 70 |
3 | Neatness & Dimensioning | 10 | 10 |
| Total | 100 | 100 |