CIVIL DRAFTMANSHIP ESTIMATING AND COSTING-2
Department of Technical Education, Karnataka DIPLOMA IN CIVIL D’ SHIP SIXTH SEMESTER Subject:: ESTIMATING AND COSTING-II Hours/Week - 04 Total hours/ Semester-64 TOPIC ANALYSIS Chapter No. Content No. of hours Marks Weightage PART –A 1 Renovation & Remodeling of building 7 20 2 Valuation and Rent fixation 6 20 3 Road works 11 20 PART – B 4 Culverts 11 30 5 Irrigation works 11 30 6 Sanitary works 11 30 7 Innovation and seminar 04 Tests 03 Total= 64 Total=150marks DETAILS OF CONTENTS PART-A 1.Renovation & Remodeling of building 1.1 Concrete floor to Mosaic floor. 1.2 Converting the existing to the required accommodation. 1.3 Converting the Tiled and Mud roofs to R.C.C roofs. 1.4 Re-plastering. 1.5 Re-painting of internal and external walls. 1.6 Repainting of wood works. 1.7 Water proofing of existing roof. 2. Valuation and Rent fixation 2.1 Definition, Meaning and purpose of valuation. 2.2 Factors governing valuation. 2.3 Scrap value, Salvage value, Market value, Book value and sinking fund. 2.4 Calculation of depreciation by different methods. 2.5 Methods of valuation. 2.6 Rental value based on plinth area method. PART – B 3. Detail Estimates and Abstract of Cost of Road work 3.1 Compute earth work quantities from given cross sectional details 3.2 Preparation of Detailed Estimates and Abstract of Cost of a. WBM/WMM Roads b. Bituminous Roads c. Concrete Roads 4. Culverts Preparation of Detailed Estimates and Abstract of Cost of a. Slab Culvert b. Arch Culvert 5. Irrigation works Detailed Estimates and Abstract Cost of a. Lined Canal b. Tank weirs c. Tank Sluice 6. Sanitary works Detailed Estimates and Abstract Cost of a. Manhole b. Septic Tank c. Soak pit. 7. Innovation and seminar Estimation of sanitary and water supply connection for a residential/public/institutional building. General Educational Objectives Upon the completion of the study of the subject the student should be able to 1. Understand the method of estimating renovation and remodeling works. 2. Know the method of building valuation 2. Understand the method of preparing abstract estimate for Civil Engineering works. Specific Instructional Objectives Upon the completion of the study of the subject the student should be able to 1. Get an idea of renovation and remodeling of an existing items of a building. 2. Know the value of property and fixing of rent. 3. Prepare the estimate & cost for the following road works 3.1 Earthwork for roads. 3.2 Water bound macadam road( WBM) / Wet mix macadam road(WMM) 3.3 Bituminous roads 3.4 Concrete roads 4. Prepare the estimate & cost for the following culverts 4.1 Single span Slab culvert ( Splayed and Return type wing wall) 4.2 Single span Arched Culvert 5. Prepare the estimate & cost for the following Irrigation works 5.1 Earth work for canal 5.2 Canal lining 5.3 Tank weirs ( Vertical drop only) 5.4 Tank sluice ( head wall, gibbet wall with rectangular barrel) 6. Prepare the estimate & cost for the following Sanitary works 6.1 Manhole 6.2 Septic tank 6.3 Soak pit 7. Seminar and innovative practice 7.1 Understand the method of estimating Sanitary and water supply connections for buildings. REFERENCE BOOKS 1 Estimating and costing-II - By H.S.Vishwanath. Sapna Publications. 1 Estimating and costing By B. N. Datta. 2 Estimating and costing -By M. Chakraborti. 3 Estimating and costing -By S. C. Rangwala. 4 Estimating and costing -By G. S. Birdie. 5 Estimating and costing -By V. N. Vazirani and S.P.Chandola. |
Comments